Photo

Arpan Maheshwari

Lead Material Handling engineer / Sr. Mechanical Engineer @ Hanwha Ocean (Noida, India)

Noida arpan.maheshwari91@gmail.com 8860990823
Current CTC
36 LPA
Expected CTC
45 LPA
Notice Period
60 Days
Experience
14.0 Years
Profile Summary

13 years of extensive work experience in FEED / Detail engineering of offshore / Onshore projects i.e., FPSO, semi-sub platforms, jack-up drilling rig, FLNG, etc.
Well versed with the ASME, NORSOK codes and standards. Currently working as Manager in Hanwha Ocean in mechanical department. My major work exposure includes:
• Development of Material-handling philosophy for FEED and EPC.
• Preparing detailed Material Handling Reports and lifting plans.
• Project activities i.e. Manpower / Activity planning / progress reporting, etc.
• Procurement activities i.e. technical quotations, datasheets, etc.
• Client and vendor interface.
• Technical expertise in Material Handling Solutions for topside equipment (mechanical, electrical, safety, HVAC etc.) and piping components.
• Conducting 3D Model Review and workshops (HFE / JHA / FTA / Constructability).
• Development of Material Handling Layouts.
• Crane studies (Pedestal and Mobile Cranes)
• Preparing process piping Layout in PDMS and SP3D.
• Operation and maintenance related activities for process equipment (Rotary / Static / Package).
• Equipment layout arrangement for both topside and hull.
• Miscellaneous PDMS activities i.e., report extraction, isometrics extraction
• Structural secondary and tertiary drawing development.

Work Experience
2025 – Present
Lead Material Handling engineer / Sr. Mechanical Engineer
Hanwha Ocean (Noida, India)

Current Project: (Bidding and Pre-Feed)

  • On Job Role – Lead Material Handling engineer / Sr. Mechanical Engineer
  • Mechanical package activities for topside equipment: MR, MDS and TBE.
  • Material handling activity plan
  • Topside Layout development
2025 – 2025
Lead Mechanical Engineer (Material Handling SME)
Sidvin Core Tech (Bengaluru, India)

GDM FPSO: (Current Project) – Client: MODEC / Shell

  • On Job Role – Lead Mechanical Engineer (Material Handling SME)
  • Executed complete topside MH activities from Pre-FEED planning to Detailed Engineering design completion.
  • Client and sub-supplier interfaces.
2024 – 2024
Material Handling Consultant
Aibel As (Asker, Norway)

Snøhvit Future:

  • On Job Role - Material Handling Consultant
  • Developed layout and material handling report.
  • Handling client / vendor interfaces.
2022 – 2024
Lead material handling engineer
Aker Solutions (Mumbai)

Yggdrasil Hugin-A – Client: Aker BP

  • On Job Role - Lead material handling engineer
  • Material handling PRDE (Package responsible discipline engineer) for all topside equipment.
  • Developed layout and material handling report.
  • Handling client / vendor interfaces.

GALLAF PHASE -2 - well head platform (WHP), Brownfield:

  • On Job Role - Sr. material handling engineer
  • 60% and 90% Model Review point closure.
  • Verification and submission of final MH report.
2019 – 2022
Lead material handling engineer
Mcdermott (Gurgaon)

SCARBOROUGH semi-submersible FPU – Client: Woodside

  • On Job Role - Lead material handling engineer.
  • Weekly client review and progress reporting.
  • All Interdisciplinary coordination and model reviews.
  • manpower planning and MH activity planning.
  • Vendor interactions for MH requirements on equipment and vendor document reviews.
  • Development of lifting plans for all topside equipment and piping components.
  • Development of Material-handling philosophy in both FEED and EPC phase.
  • Material-handling report.
  • Various structural inputs as per our lifting plans i.e., load paths, plated and grated area, lifting appliances location, deck capacities etc.
  • Preparation of Mechanical requisition for MH equipment.

 

ADNOC Crude Flexibility Project (CFP): ATMOSPHERIC RESIDUE DESULFERISER (ARDS) Unit

  • Prepared Material Handling Report for complete project.
  • Mobile crane study
2012 – 2019
Samsung Heavy Industries (Noida)

RELIANCE FPSO

  • Piping and Equipment Layout for STP Turret and Topside Interface.
  • Bid Clarification Meetings with Equipment Vendors.
  • Material Handling documents preparation including Layout, reports and philosophy.
  • Pedestal crane study.

BP MAD DOG Phase 2: (floating production platform of BP in Gulf of Mexico)

  • Piping Bulk and Valve MTO preparation
  • FEED document review.
  • Deputed to S. Korea to support HFE (Human Factor Engineering) Team :

o Equipment arrangement based on operation and maintenance for Hull Deck box and Living Quarter.

o Design Review with the Client BP

o Material handling report preparation for Hull.

o 60% model review comment closure reports related to material handling activities.

ENI Coral FLNG (Floating Liquefied Natural Gas)

  • Equipment arrangement of AFT Hull machinery area.
  • Piping layout in SP3D for Aft hull machinery area.
  • Material handling report preparation.

EGINA FPSO (Third deep offshore development of Total in Nigeria)

  • Piping Layouts in PDMS for Oil separation module and Oil Offloading Module.
  • Interdisciplinary Design Reviews related to piping and Material handling of equipment and critical valves.
  • Deputed to Korea to support HFE (Human Factor Engineering) Team in:

o Prepared Material Handling Reports of Topside facility.

o Material Handling Solutions and layout after 60% and 90% client review.

o Prepared Material Handling Layouts for Topside modules.

o Prepared Handling schemes and simulations of Equipment and Valves.

Ichthys Central Processing Facility (CPF) - world’s largest column stabilized, offshore semi-submersible platform of INPEX in Browse Basin of western Australia

  • Conversion of PDMS model to SP3D model.
  • Deputed to Korea to support Piping Team in:

o Piping layout for Bilge System in PDMS.

o Piping Layout for Sea Water System in PDMS.

o Pipe Support Modeling in PDMS.

CAT-J (Statoil Category-J Jack up Drilling Rig, Norwegian Continental Shelf)

  • Piping layout for Sea Water system in PDMS
  • Supported Structural Dept. as Model Coordinator for Living quarters.
  • Prepared PDMS Model of HULL structure.
  • Prepared Material Take off (MTO) report of Structure.
  • Handled Interdisciplinary Design Reviews.
  • Prepared structural secondary and tertiary drawing.
Education
U.P. Technical University, India
B.Tech in Mechanical
N/A - 2012
Resume Preview
Resume
4541415f8b0745248868237ec36fbb23.pdf
PDF File
Download Resume
Top Skills
Auto Cad Caesar-Ii Critical Thinking E3D Ms Office Navis Works Pdms Smart Plant 3D (Sp3D) Team Leader